Monday, November 1, 2021

Spaoh

Uggah chides detractors for lying

SPAOH: Deputy Chief Minister Datuk Amar Douglas Uggah Embas has challenged his detractors to show proof that the Iban majority seat had little progress and development under him. He said certain quarters had often harped on the issue when alluding...

Village drains to be upgraded

SPAOH, Betong: A RM2 million allocation under the Rural Transformation Programme (RTP) will be spent to upgrade the drains at Kampung Bungin here and solve the issue of flash floods there. Saribas assemblyman, Mohammad Razi Sitam said many villages in...

RM100,000 for new steel bridge

SPAOH: The old bridge in Melabu Tengah which was destroyed during a recent flood will be replaced with an RM100,000 steel suspension bridge. Deputy Chief Minister Datuk Amar Douglas Uggah Embas announced the allocation during a meeting with the longhouse...

Spaoh residents want ATM

SPAOH: Lembaga Amanah Khairat Islam Spaoh (Lakis) has requested the government to set up an automatic teller machine (ATM) in Spaoh. Its chairman Dr Abang Ismail Abang Julhi said that based on the findings of a poll conducted last week...

Bigger SST revenue expected for 2021

SPAOH: Sarawak expects bigger revenue from its State Sales Tax (SST) imposed on petroleum products for this year. Chief Minister Datuk Patinggi Abang Johari Tun Openg said he based his optimism on the increasing trend in world oil prices. “In 2019,...

Abang Johari announces building of RM30 million bridge

SPAOH: A RM30 million bridge will be built here, said Chief Minister Datuk Patinggi Abang Johari Tun Openg during his working visit today. “This new bridge has become necessary because the existing bridge cannot bear the weight of heavy vehicles...

Building of Bebuling STOLport is fulfilment of a promise

SPAOH: Chief Minister Datuk Patinggi Abang Johari Tun Openg said he has made good on his promise of building an airport in Spaoh. “Today, I have delivered on my promise. The establishment of an airport is important as this place...

RM464.9 mln in projects approved for Spaoh

SPAOH: A total of RM464.9 million in development projects has been approved for the Spaoh sub-district, said Deputy Chief Minister Datuk Amar Douglas Uggah Embas. He said two projects — the Sungai Paku bridge and the Bebuling short take-off and...

Proposed ‘STOLport’ to begin construction soon

SPAOH: The anticipated Bebuling short take-off and landing airport (STOLport), which costs an estimated RM108.1 million, is expected to begin construction soon and completed within 30 months. Deputy Chief Minister Datuk Amar Uggah said that Chief Minister Datuk Patinggi Abang...

Always be mindful of SOP compliance

SPAOH: Deputy Chief Minister Datuk Amar Douglas Uggah Embas urged rural folks to constantly remind each other of the importance of complying with the Covid-19 standard operating procedure (SOP) as there has been an increase in positive cases in...
- Advertisement -spot_img

Latest News

Uggah chides detractors for lying

SPAOH: Deputy Chief Minister Datuk Amar Douglas Uggah Embas has challenged his detractors to show proof that the Iban...
- Advertisement -spot_img