Author: Alverdtekoster Anyap

New Bau District Office building to be completed by April

BAU: The construction of the new Bau District Office building, costing RM4.6 million, is expected to be completed by the end of April. Tasik Biru assemblyman Datuk Henry Harry Jinep said because of the movement control order (MCO), work was halted. He said the contractor extended the date of completion

Over 15,000 residents have registered for the vaccine

BAU: More than 15,000 residents in Bau District have registered for the Covid-19 vaccination, said Tasik Biru assemblyman Datuk Henry Harry Jinep. He hoped that more residents would register for the free vaccine. “Bau has a population of around 62,000. We aim for 40,000 residents here to register for the

Adapting to the new norm

KUCHING: There is no doubt that the Covid-19 pandemic has affected many industries and sectors in the state. Nevertheless, everybody has to adapt to the new normal to make ends meet. Last Saturday (Feb 13), the Sarawak Disaster Management Committee (SDMC) announced the extension of the current conditional movement control

MBKS distributes food items to residents

KUCHING: KMC flat residents received food items from Kuching South City Council (MBKS) under its ‘Caring Society Programme’ for this year’s Chinese New Year (CNY). MBKS have partnered with Tay Motors, Wide Way Food Enterprise Sdn Bhd and CCK Sdn Bhd to distribute the food items to 532 residents. The

State records 219 new positive cases today

KUCHING: Sarawak recorded 219 new positive cases today, bringing the total to 5,676 cases. The Sarawak Disaster Management Committee (SDMC) said two new deaths were also recorded, bringing the total to 50. The new cases were in Sibu (55), Song (50), Beluru (35), Miri (32), Kapit (25), Samarahan (5), Kanowit

Villagers welcome better connectivity

PADAWAN: Assistant Minister of Transport Datuk Dr Jerip Susil today officiated at the launch of an agricultural road from Kampung Abang to Kampung Biya Jaber constructed under the Rural Transformation Programme (RTP). The Mambong assemblyman also revealed another project under RTP to build a bridge from Kampung Abang to Sekolah

Bridge to link school and village soon

PADAWAN: A bridge will be built to connect Kampung Abang to Sekolah Kebangsaan Pangkalan Ampat here to ease the burden of teachers, school staff and students. Assistant Minister of Transport Datuk Dr Jerip Susil said a road project will also be constructed under the Rural Transformation Programme (RTP) in the

Road to facilitate farming activities

PADAWAN: A farm road will be built for the people of Kampung Biya Jaber to go to their farms. “The project is under the rural transformation programme (RTP) and the cost of building it is RM500,000,” said Assistant Transport Minister Datuk Dr Jerip Susil. He said this after the earth

Barricades will not keep them in

KUCHING: No number of barricades is sufficient if self-awareness and discipline are ignored by the people in efforts to contain the Covid-19 pandemic especially in rural longhouses. This was stated by Assistant Minister for Youth and Sports, Datuk Snowdan Lawan when commenting on longhouse residents escaping movement restriction order. “Chief

Catering business keeps single mother going

KUCHING: The Covid-19 pandemic has affected many people economically. But AmyRozila Saili, a single mother of three here, is doing quite well in her home-based small catering business.  “I started venturing into the catering business in 2015,” said the 35-year-old woman who used to work in a private hospital as